Building a Successful Commercial Construction Defect Suit

A large building owned by Elrod’s client was severely damaged when it was struck with high-speed winds during a storm. Large sections of wall on the building collapsed, and investigation revealed that design and construction defects caused or contributed to the damage. Elrod brought suit against two of the contractors involved in the construction of the building, which took place nearly a decade before. more >

<<1 of 5>>